Alabama Power, Central Alabama Generating Station

Central Alabama Generating Station is a 3 on 1 combined cycle generating station. E2E was responsible for the hardware design and wiring termination package for migration of the Allen Bradley Infa-90 control system to Emerson Ovation. Subsystems included the HRSG’s , Duct Burners, Water Treatment (Partial), and Common Equipment. E2E provided on site engineering support during outage activities through startup.


Fall 2023, 927 MW Facility

3335 IO

NV Energy, Las Vegas Generating Station

Las Vegas Generating Station is two 2 on 1 combined cycles and one 1 on 1 combined cycle plant. E2E was responsible for the hardware design, wiring termination package, site management, loop testing, and PE stamping for migration of the Allen Bradley Infa-90 and Siemens control system to Emerson Ovation. Subsystems included the HRSG’s, Water Treatment, Common Equipment, and Steam Turbine. E2E provided on site engineering support during outage activities through startup.


Fall 2022, 272 MW Facility

2535 IO

NV Energy, Silverhawk

Silverhawk is a 2 on 1 combined cycle generating plant. E2E was responsible for the hardware design, wiring termination package, site management, loop testing, and PE stamping for migration of the Allen Bradley Infa-90 and Siemens control system to Emerson Ovation. Subsystems included the HRSG’s, Water Treatment, Common Equipment, and Steam Turbine. E2E provided on site engineering support during outage activities through startup.


Spring 2022, 520 MW Facility

2654 IO

Golden Spread, Mustang Station

Mustang is a 2 on 1 combined cycle and two simple cycle generating plant. E2E was responsible for the hardware design, wiring termination package, and loop testing, for migration of the Allen Bradley Infa-90 and Siemens control system to Emerson Ovation. Subsystems included the HRSG’s, Water Treatment, Common Equipment, and Steam Turbine. E2E provided on site engineering support during outage activities through startup.


Fall 2020, 521 MW Facility

2988 IO

Constellation, Handley Generating Station

Mustang is a 3 unit steam generating plant. E2E was responsible for the hardware design and wiring termination package for migration of the Honeywell HPM and Siemens control system to Emerson Ovation. Subsystems included the U3 BMS, BCS, BTG Board, DAS, and U3-5 Steam Turbine System. E2E provided on site engineering support during outage activities through startup. E2E was also responsible for the PE stamping of the U4 and 5 AVR subsystems and has future commitments for the U4 EHC engineering.


Spring 2021-Spring 2024, 1,265 MW Facility

2475 IO

Dominion Energy, Gaston Hydro

Gaston is a 4 unit, remotely controlled, hydro generating plant. E2E was responsible for the hardware design and wiring termination package for migration of the Woodward and Modicon control system to Emerson Ovation. E2E provided on site engineering support during outage activities through startup.


Spring 2022, 220 MW Facility

947 IO

Dominion Energy, Roanoke Hydro

Roanoke is a 4 unit, relay controlled, hydro generating plant. E2E was responsible for the hardware design and wiring termination package for migration of the existing relay control system to Emerson Ovation.


Fall 2022, 95 MW Facility

590 IO

Clark Public Utilities, River Road Generating Plant

CPU is a 1 on 1 combined cycle generating plant. E2E was responsible for the hardware design and wiring termination package for migration of the existing Fisher control system to Emerson Ovation. E2E provided on site engineering support and Site Management during outage activities through startup.


Fall 2020, 248 MW Facility

660 IO

Duke Energy, Marshall Steam Station

Marshall Steam Station is a 4 unit steam generating plant. E2E was responsible for the hardware design and wiring termination package for migration of the existing Bentley control system, on the unit 3 and 4 main steam turbine and boiler feed pumps, to Emerson Ovation. E2E provided on site engineering support and Site Management during outage activities through startup.


Spring 2022 & 2023, 2078 MW Facility

288 IO

Duke Energy, Noblesville Combined Cycle Power Station

Noblesville Station is a 3 on 2 combined cycle generating plant. E2E was responsible for the hardware design and wiring termination package for migration of the existing Siemens control system to Emerson Ovation. Subsystems included the U1 and 2 Steam Turbine System. E2E provided on site engineering support during outage activities through startup.


Spring 2020, 283 MW Facility

284 IO